Most all of the shelving and equipment was removed from this library for a complete make-over.  The new shelving was located around the perimeter of the room which really opened up the library.  The large circulation desk was removed and custom made cabinets were installed to set with-in some existing shelving to give the librarian flexibility. Additional activity tables were supplied to match existing and new solid plastic chairs were furnished.  Existing computer stations were re-positioned which help with the open look.  Metal shelving with plastic laminated end panels were installed without tops which provided more shelf room.



About Us

Our Products

View Current Projects

State Contracts

Contact Us